|
This new bridge is as fresh as 2005. It was built as a
highway over the Idde Fjord. The bridge stretches about 704 metres and the
medium span of the bridge is around 247 meters. The New Svinesund
Bridge was built in
concrete, composed of one arch only and having two strong steel bridge decks on
each of the sides of the concrete arch. The New Svinesund
Bridge is a resistant
architectural masterpiece.
|